Material ### 4400 cannot be used in inbound delivery because QM is active
阅读量:7197 次
发布时间:2019-06-29

本文共 3164 字,大约阅读时间需要 10 分钟。

SAP MM VL31N Error Msg - Material 47-54-039-004 4400 cannot be used in inbound delivery because QM is active -

【Error Msg】

SA document number: 5500019471

 

Z

 

Material 47-54-039-004 4400 cannot be used in inbound delivery because QM is active

Message no. L9528

 

Diagnosis

QM is active for material 47-54-039-004 in plant 4400. As a result, the material cannot be used in an inbound delivery item because the item is relevant for picking and because WM is active for the item.

 

This process is not supported in the current release.

 

Procedure

Execute the putaway using a goods receipt posting with subsequent

putaway in the Warehouse Management system.

 

 

考意1

We have the same situation – even SAP themselves did not find any solution to the fact that the QM and WM cannot work together, if IBDLV is used. The reason is the fact that using IBDLV enables the creation and confirmation of putaway TO before GR – which triggers creation of the inspection lot. And the new quant might be merged with older quant, making it impossible for the system to know where the insp.lot. belongs to.

We have used an alternative flow, a workaround with a separate storage location (not assigned to WM) used for GR and QM processes and then after GR an automated Transfer Posting from ‘GR-stor.loc.’ to ‘WM-stor.loc’ .

This TP is triggered by an Output on the GR material doc., this output (special function) triggers a little program collection the necessary data from standard tables + a special control table, enters the data into a MBGMCR idoc using GM code 04, and processes this idoc with target ‘own system’. Using normal condition technique, this output can be controlled via event type (WE,WQ) so the transfer will be triggered immediately if materials are not QM-active, but will await QM usage decision if QM is active.

The TP will result in a putaway TO in WM – we have incorporated in the special function that the GR . is copyed into the TP mat.doc. as a header text. Since the putaway TO will refer to the TP mat.doc., it is possible to trace back to the GR PO, if necessary.
BR,
Sigurds

 

 

考意2

 

We are not using HUM however using WM. Nonetheless, the problem persist while creating inbounds. 

 

We are trying to use the following approach to address this problem. 

 

uncheck 'relev. for putaway' indicator from 'ELN' item category thus enabling VL31N to by-pass the hard stop incurred due to QM activation.

 

SAP's reason for this hardstop is to avoid inconsistencies that may arise when TO's are created for inbound deliveries before GR is posted. This scenario does not pertain to us since TO for inbounds before GR is not applicable. Therefore, we are enabling the above configuration. By doing this, we are breaking the link between inbound delvy's and WM, and thus disabling the functionality of creating TO's referencing inbound delvy's (transactions like LT03, LT0F become irrelevant).

 

But, this process will not work if we implement HUM since standard SAP will not allow to create a putaway TO referencing a TR or a material document. It becomes imperative to create a TO referencing a delvy, but this configuraton will break that link hence it will not work.

 

Best Regards.

转载地址:http://zvkum.baihongyu.com/

你可能感兴趣的文章
Apache Thrift入门1-架构&介绍
查看>>
rabbitmq集群是否出现脑裂监控
查看>>
java synchronized关键字的用法--对象锁和类锁
查看>>
任务3 SQL语句相关问题
查看>>
c primer plus(第五版)读书笔计 第四章(3)
查看>>
c primer plus(第五版)读书笔计 第六章(6)
查看>>
MAC OS 10.10.5虚拟机免费下载(可安装Xcode7)
查看>>
我的友情链接
查看>>
Office 365 系列之八:批量部署 O365 客户端
查看>>
分享Kali Linux 2017年第30周镜像文件
查看>>
Centos6.8部署jenkins2.46.2
查看>>
SQL Server 内存分配
查看>>
Java 之原型模式
查看>>
Spring+quartz实现动态化定时任务
查看>>
Linux之NTP时间服务器配置部署
查看>>
我的友情链接
查看>>
python 安装mssql扩展
查看>>
js实现点击copy,可兼容
查看>>
oracle安装笔记 win
查看>>
我的友情链接
查看>>